Two acres of hard standing between four office blocks, used as overflow parking and nothing else.
We took out 900 square metres of paving, built structural soil beds that a car park slab can drain into, and planted for shade over the walking routes rather than over the tarmac. Staff now cross the site under canopy in April.






